Shooting Schedule 3 - Drama Studio

On the 17th of November I arranged to film the dream sequence of my music video in the drama studio at school. I visited the drama teacher and got his permission to use the room on this day between 12:15 and 3:00pm. Here is my shooting schedule for this day.


Filming for this scene was a success however the schedule ran over by 15 minutes than planned resulting in only having half the amount of time to pack everything away as I had arranged. This was due to having not filmed a long shot of the actors dancing in time as it took multiple tries to get the best angle while keeping their full bodies illuminated by the flashing light. I knew I had time spare to do this as after setting up I knew exactly how to pack everything away and where all the school equipment went so knew we wouldn't be late to leaving when we needed to. 

Comments

Popular posts from this blog

Chosen Font