Shooting Schedule 3 - Drama Studio

On the 17th of November I arranged to film the dream sequence of my music video in the drama studio at school. I visited the drama teacher and got his permission to use the room on this day between 12:15 and 3:00pm. Here is my shooting schedule for this day.


Filming for this scene was a success however the schedule ran over by 15 minutes than planned resulting in only having half the amount of time to pack everything away as I had arranged. This was due to having not filmed a long shot of the actors dancing in time as it took multiple tries to get the best angle while keeping their full bodies illuminated by the flashing light. I knew I had time spare to do this as after setting up I knew exactly how to pack everything away and where all the school equipment went so knew we wouldn't be late to leaving when we needed to. 

Comments